2021 Morocco As part of the construction of lines T4 and T3 of the Casablanca tramway, a new centre of excellence for the operation and maintenance of the tramway will be built and equipped with our new generation of UnderFloor Wheel Lathe RNG20. Our supply includes a dedicated Shunter integrated with the Lathe.